The photo, from November 20th, shows the spreader test for loading aluminum at the port of Itaqui — Photo: G5 Logística
We continue to prepare for the return of aluminum shipments.
Yesterday (24) we carried out a simulation with the spreader, equipment that allows the load to be lifted in an efficient and safe manner.
In the images we see the spreader tests in two methodologies: the conventional , with steel cables, and the "toplifting" modality, in which the load is lifted with straps.
The first ship is scheduled for the beginning of December and will have a volume of 15 thousand tons destined for the port of Rotterdam - Netherlands. This operation is a partnership between @g5.logistica @steinweg.netherlandse @south_32G5
Logistics and Transport