The photo, from November 14th, shows the aluminum shipment process at the port of Itaqui — Photo: G5 Logística
It is with great satisfaction and enthusiasm that G5 begins another "Aluminum Operation" (Alumar).
The total estimated load for this operation is 15,000 tons of aluminum, divided into batches of 1000 and 1500 tons, destined for the Port of Rotterdam The first batch arrived in the pre-boarding area on 11/13, and the first ship is expected to arrive on 12/04.
Operational viability was achieved through a commercial partnership between G5 Log, @steinweg .netherlands, Consórcio Alumar and EMAP @portodoitaqui.
G5 Logistics and Transport